Revision Schedule GF:

1. replace the art gallery on the left arch with a bar and private seating area. 31/01/2023

2. Add a fire escape staircase on the left arch.

3. remove all the front desks in the sports area. 31/01/2023

4. remove the dressing room in the parkour area. 31/01/2023

Revision Schedule 1F:

  1. Add office space on the left arch space.31/01/2023
  2. replace the pool room with the multifunctional room. 31/01/2023
  3. move the pool room to the send to right arch space. 31/01/2023
  4. remove the private seating area and replace it with a metal walkway and bouldering installation on the wall. 31/01/2023

Does the change space count as a revision or just a change of schedule of accommodation?

Revision box example :

HOW TO READ STRUCTURAL DRAWINGS: A DEEP DIVE FROM A TO Z – Sheer Force Engineering

Detail for Plan drawing system:

Technical Drawing: Plans – First In Architecture

Technical drawing lable system :

Technical Drawing: Labelling and Annotation – First In Architecture

General layout fro detail and so on:

Technical Drawing: Layout – First In Architecture