Revision Schedule GF:
1. replace the art gallery on the left arch with a bar and private seating area. 31/01/2023
2. Add a fire escape staircase on the left arch.
3. remove all the front desks in the sports area. 31/01/2023
4. remove the dressing room in the parkour area. 31/01/2023
Revision Schedule 1F:
- Add office space on the left arch space.31/01/2023
- replace the pool room with the multifunctional room. 31/01/2023
- move the pool room to the send to right arch space. 31/01/2023
- remove the private seating area and replace it with a metal walkway and bouldering installation on the wall. 31/01/2023
Does the change space count as a revision or just a change of schedule of accommodation?
Revision box example :
HOW TO READ STRUCTURAL DRAWINGS: A DEEP DIVE FROM A TO Z – Sheer Force Engineering
Detail for Plan drawing system:
Technical Drawing: Plans – First In Architecture
Technical drawing lable system :
Technical Drawing: Labelling and Annotation – First In Architecture
General layout fro detail and so on:
Technical Drawing: Layout – First In Architecture
Leave a Reply