The mast installation was the first part of the project.
In summer 2023 the design was finalised and signed-off for going to manufacturing, with delivery and assembly commencing during October 2023. On 8th February 2024 the final lift of the top segment to 100 m.
- Free standing 100 m
- Three 1/2" synflex tubing inlets 100 m
- Two 1/2" synflex tubing inlets 50 m
- Two 1/4" synflex tubing inlets 100 m
- One 50 mm HDPE tubing inlet at 100 m
- One 50 mm HDPE tubing inlet at 50 m
- Three wind sonics at 100 m
- Two wind sonics at 50 m
- Temperature sensors every 10 m
- Some contingency in place for additional equipment e.g. for local scale flux measurements
Some photos of the tower assembly and equipment installation during October 2023 to February 2024 are below.